{"componentChunkName":"component---src-templates-pagina-foglia-completa-template-en-jsx","path":"/en/volcanic/etna-eruption-2002-2003/","result":{"data":{"node":{"title":"Etna Eruption 2002-2003","field_titolo_esteso":"Etna Eruption 2002-2003","drupal_internal__nid":900013459,"field_data":"2024-07-09T14:34:11+02:00","field_id_contenuto_originale":900013458,"field_categoria_primaria":"pagina","field_streaming_homepage":false,"field_link":null,"body":{"processed":"

The 2002-2003 Etna emergency involved a volcanic eruption and a seismic sequence, affecting many municipalities in the Etna area and requiring a complex intervention by the National Civil Protection System.

\n

Photo: Etna eruption of October 30, 2002 / International Space Station, public domain at commons.wikimedia.org

\n"},"fields":{"slug":"/volcanic/etna-eruption-2002-2003/"},"field_link_esterni":[],"field_tabella":null,"relationships":{"field_immagine_dettaglio":{"field_alt":"Eruzione Etna 2002","field_didascalia":"Eruzione Etna 2002","field_titolo_esteso":"Eruzione Etna 2002","relationships":{"image":{"localFile":{"publicURL":"/static/0d6b2636647ec54da3c62f943b007b1d/evid-eruzione-etna-2002.jpg","childImageSharp":{"fluid":{"aspectRatio":1.5027322404371584,"src":"/static/0d6b2636647ec54da3c62f943b007b1d/14b42/evid-eruzione-etna-2002.jpg","srcSet":"/static/0d6b2636647ec54da3c62f943b007b1d/cf463/evid-eruzione-etna-2002.jpg 275w,\n/static/0d6b2636647ec54da3c62f943b007b1d/dee3b/evid-eruzione-etna-2002.jpg 550w,\n/static/0d6b2636647ec54da3c62f943b007b1d/14b42/evid-eruzione-etna-2002.jpg 800w","sizes":"(max-width: 800px) 100vw, 800px"}}}}}},"field_sottodominio":{"name":"Emergenze"},"field_riferimento_traduzione":{"fields":{"slug":"/vulcaniche/eruzione-etna-2002-2003/"}},"field_immagine_singola":null,"field_mappa":null,"field_box_social":null,"field_accordion":[{"field_titolo":"The main events","field_tabella":null,"field_testo":{"processed":"

On October 26, 2002, a seismic swarm was detected on the northeastern slope of Etna. This was followed by the start of eruptive activity, forming a volcanic fracture that spread south-southwestward and intense lava fountain activity. At the same time, an ash plume was released from the northern and southern sectors of the fracture. The emission of ash from Etna's pyroclastic cones immediately became one of the most critical concerns in emergency management.

\n

On October 27, alerting procedures were activated, and department staff traveled to the site. One day later, on October 28, ground support services were activated. At the same time, monitoring activities were fully implemented and intensified, and risk scenarios were simulated.

\n

On October 29, a magnitude 4.4 earthquake with a macroseismic epicenter in S. Venerina was recorded, followed by further tremors. The municipalities of Zafferana, Milo, Sant'Alfio, Acireale, Piedimonte, Fiumefreddo, Acicatena, and Giarre were affected. Tent camps were set up, and emergency work was initiated. Damage assessment units were promptly established to inspect the affected areas, and efforts were made to secure public and private buildings.

\n

On November 13, a new vent on the volcano's southern slope opened, and a new flow began to propagate. To manage the effects of this eruption, it was decided to open a Joint Operations Center (COM) in Ragalna and an Advanced COM at the premises of the restaurant \"La Cantoniera\" west of Rifugio Sapienza.

\n

On November 21, a new volcanic vent opened at a lower altitude of 2750m compared to the previous one. This vent released a lava flow that approached the Rifugio Sapienza in the following days. As a result, the 4th Engineer Regiment (Reggimento Genio Guastatori) of Palermo was called in to assist, and together with private companies, they built earth dams to contain the lava flow.

\n

Since December 10, lava emission from a fracture located at the southeast base of the 2750m elevation cone again threatened the area of Rifugio Sapienza in the province of Catania. After a new increase in the effusion rate, on December 16, the edge of the lava overflowed the banks. It destroyed the building housing the Service Center of the Municipality of Nicolosi near the Rifugio Sapienza and the \"Esagonal\" restaurant.

\n

Effusive and explosive activity, including ash emissions, continued throughout December and January.

\n

On January 29, 2003, the lava flows cooled, and explosive activity ended.

\n","value":"

On October 26, 2002, a seismic swarm was detected on the northeastern slope of Etna. This was followed by the start of eruptive activity, forming a volcanic fracture that spread south-southwestward and intense lava fountain activity. At the same time, an ash plume was released from the northern and southern sectors of the fracture. The emission of ash from Etna's pyroclastic cones immediately became one of the most critical concerns in emergency management.

\r\n\r\n

On October 27, alerting procedures were activated, and department staff traveled to the site. One day later, on October 28, ground support services were activated. At the same time, monitoring activities were fully implemented and intensified, and risk scenarios were simulated.

\r\n\r\n

On October 29, a magnitude 4.4 earthquake with a macroseismic epicenter in S. Venerina was recorded, followed by further tremors. The municipalities of Zafferana, Milo, Sant'Alfio, Acireale, Piedimonte, Fiumefreddo, Acicatena, and Giarre were affected. Tent camps were set up, and emergency work was initiated. Damage assessment units were promptly established to inspect the affected areas, and efforts were made to secure public and private buildings.

\r\n\r\n

On November 13, a new vent on the volcano's southern slope opened, and a new flow began to propagate. To manage the effects of this eruption, it was decided to open a Joint Operations Center (COM) in Ragalna and an Advanced COM at the premises of the restaurant \"La Cantoniera\" west of Rifugio Sapienza.

\r\n\r\n

On November 21, a new volcanic vent opened at a lower altitude of 2750m compared to the previous one. This vent released a lava flow that approached the Rifugio Sapienza in the following days. As a result, the 4th Engineer Regiment (Reggimento Genio Guastatori) of Palermo was called in to assist, and together with private companies, they built earth dams to contain the lava flow.

\r\n\r\n

Since December 10, lava emission from a fracture located at the southeast base of the 2750m elevation cone again threatened the area of Rifugio Sapienza in the province of Catania. After a new increase in the effusion rate, on December 16, the edge of the lava overflowed the banks. It destroyed the building housing the Service Center of the Municipality of Nicolosi near the Rifugio Sapienza and the \"Esagonal\" restaurant.

\r\n\r\n

Effusive and explosive activity, including ash emissions, continued throughout December and January.

\r\n\r\n

On January 29, 2003, the lava flows cooled, and explosive activity ended.

\r\n"},"relationships":{"field_immagine":null,"field_video":null,"field_link_interni":[]},"drupal_internal__id":21873},{"field_titolo":"Civil protection actions","field_tabella":null,"field_testo":{"processed":"

Men and vehicles deployed. During the emergency, the maximum number of rescue units was reached on November 3, with over 1,500 personnel and 500 vehicles. On average, the Civil Protection Department had 25 personnel units, the Region of Sicily had 100, the Army had 70, the Fire Brigade had 200, the State Police had 60, the Carabinieri had 80, the Air Force had 30, the State Forestry Corps had 80, and the Guardia di Finanza had 15. In total, there were 540 volunteers involved in the operation.

\n

Assisted population. On November 5, the highest number of people, 1120 in total, were accommodated in emergency facilities such as hotels and tents. By November 7, the tents were replaced by caravans. The ongoing sequence of earthquakes, with periodic more intense events, led to fluctuations in the number of people seeking emergency housing due to new injuries or fear of further tremors. From December 18, 2002, when autonomous accommodation support began, the number of people living in caravans, tents, and hotels decreased. Additionally, five temporary structures were constructed - three in S. Venerina and two in Guardia Mangano - for religious and school purposes, and multiple areas were equipped with containers used for commercial and school purposes in other locations.

\n

Safety interventions and habitability inspections. Following the initial interventions to secure unsafe buildings, over 8400 inspections were conducted to assess habitability in 14 municipalities in the Etna area. These inspections revealed that more than 3000 buildings were not fit for use. The ongoing seismic activity, characterized by periodic intense events at different epicenters, led to a surge in inspection requests. Even previously verified buildings were re-inspected due to concerns that new tremors may have caused additional damage.

\n

Emergency plans. During the emergency, emergency plans were developed for the municipalities of Linguaglossa and Ragalna, which were added to those of Belpasso, Nicolosi, and Mascalucia, which had already been prepared.

\n

Interventions for managing lava flows. The Department addressed the evolution of the lava flow on the eastern side of Etna, which threatened the settlements downstream of the eruptive vent and activated a technical-scientific and planning unit composed of regional and national Civil Protection officials. Interventions were coordinated to protect tourist facilities in the area. These interventions focused on constructing temporary earth dams to guide the natural flow of the lava and safeguard assets and related tourist and commercial activities at higher elevations. Both Army vehicles and those of private operators were utilized to redirect the lava flow away from the Rifugio Sapienza.

\n

Interventions for addressing the impacts of ash fallout. The ash fallout caused significant damage to agriculture and severe disruptions to air traffic and Catania airport. The airport was closed multiple times for several days. As a result, the Department and volunteer forces distributed protective masks. Citizens were also asked to take preventive measures to avoid respiratory complications and clean house roofs. Extraordinary efforts were also requested from agencies responsible for cleaning roads and highways to prevent accidents and clogging of sewer systems. The repeated release of ash necessitated the implementation of recurring safety measures.

\n

Health aspects. The emergency response involved activating advanced medical units, strengthening local health facilities, and organizing ambulances from agencies such as 118, the Italian Red Cross, the National Association of Public Assistance, and Misericordie. It also included identifying disabled individuals, conducting flu vaccination campaigns in reception camps, providing psychological and social assistance, distributing protective masks to safeguard respiratory health from volcanic ash during fallout, establishing an epidemiological observatory to monitor the potential impact of ash fallout on specific diseases, conducting chemical analysis, and disseminating correct behaviors to the population.

\n

Emergency telecommunications. The Department installed and activated 8 radio links on dedicated frequencies to facilitate communication among civil protection operators during emergencies. In addition, over 50 ISDN fixed telephone lines were set up for the Directorate of Command and Control and the Joint Operations Centers, and mobile phone networks were enhanced through field links.

\n","value":"

Men and vehicles deployed. During the emergency, the maximum number of rescue units was reached on November 3, with over 1,500 personnel and 500 vehicles. On average, the Civil Protection Department had 25 personnel units, the Region of Sicily had 100, the Army had 70, the Fire Brigade had 200, the State Police had 60, the Carabinieri had 80, the Air Force had 30, the State Forestry Corps had 80, and the Guardia di Finanza had 15. In total, there were 540 volunteers involved in the operation.

\r\n\r\n

Assisted population. On November 5, the highest number of people, 1120 in total, were accommodated in emergency facilities such as hotels and tents. By November 7, the tents were replaced by caravans. The ongoing sequence of earthquakes, with periodic more intense events, led to fluctuations in the number of people seeking emergency housing due to new injuries or fear of further tremors. From December 18, 2002, when autonomous accommodation support began, the number of people living in caravans, tents, and hotels decreased. Additionally, five temporary structures were constructed - three in S. Venerina and two in Guardia Mangano - for religious and school purposes, and multiple areas were equipped with containers used for commercial and school purposes in other locations.

\r\n\r\n

Safety interventions and habitability inspections. Following the initial interventions to secure unsafe buildings, over 8400 inspections were conducted to assess habitability in 14 municipalities in the Etna area. These inspections revealed that more than 3000 buildings were not fit for use. The ongoing seismic activity, characterized by periodic intense events at different epicenters, led to a surge in inspection requests. Even previously verified buildings were re-inspected due to concerns that new tremors may have caused additional damage.

\r\n\r\n

Emergency plans. During the emergency, emergency plans were developed for the municipalities of Linguaglossa and Ragalna, which were added to those of Belpasso, Nicolosi, and Mascalucia, which had already been prepared.

\r\n\r\n

Interventions for managing lava flows. The Department addressed the evolution of the lava flow on the eastern side of Etna, which threatened the settlements downstream of the eruptive vent and activated a technical-scientific and planning unit composed of regional and national Civil Protection officials. Interventions were coordinated to protect tourist facilities in the area. These interventions focused on constructing temporary earth dams to guide the natural flow of the lava and safeguard assets and related tourist and commercial activities at higher elevations. Both Army vehicles and those of private operators were utilized to redirect the lava flow away from the Rifugio Sapienza.

\r\n\r\n

Interventions for addressing the impacts of ash fallout. The ash fallout caused significant damage to agriculture and severe disruptions to air traffic and Catania airport. The airport was closed multiple times for several days. As a result, the Department and volunteer forces distributed protective masks. Citizens were also asked to take preventive measures to avoid respiratory complications and clean house roofs. Extraordinary efforts were also requested from agencies responsible for cleaning roads and highways to prevent accidents and clogging of sewer systems. The repeated release of ash necessitated the implementation of recurring safety measures.

\r\n\r\n

Health aspects. The emergency response involved activating advanced medical units, strengthening local health facilities, and organizing ambulances from agencies such as 118, the Italian Red Cross, the National Association of Public Assistance, and Misericordie. It also included identifying disabled individuals, conducting flu vaccination campaigns in reception camps, providing psychological and social assistance, distributing protective masks to safeguard respiratory health from volcanic ash during fallout, establishing an epidemiological observatory to monitor the potential impact of ash fallout on specific diseases, conducting chemical analysis, and disseminating correct behaviors to the population.

\r\n\r\n

Emergency telecommunications. The Department installed and activated 8 radio links on dedicated frequencies to facilitate communication among civil protection operators during emergencies. In addition, over 50 ISDN fixed telephone lines were set up for the Directorate of Command and Control and the Joint Operations Centers, and mobile phone networks were enhanced through field links.

\r\n"},"relationships":{"field_immagine":null,"field_video":null,"field_link_interni":[]},"drupal_internal__id":21874}],"field_tab":[],"field_immagine_anteprima":null,"field_galleria_flickr":null,"field_galleria_foto":null,"field_video_content":null,"field_allegati":[{"title":"Eruzione Etna 2002-2003: cronologia degli eventi principali e azioni di protezione civile","field_titolo_esteso":"Eruzione Etna 2002-2003: cronologia degli eventi principali e azioni di protezione civile","relationships":{"field_allegato":{"filesize":23136,"localFile":{"publicURL":"/static/70cf685f57f6c963b5e1b219a9c4caca/etna_2002_2003cronologia_eventi_azioni.pdf","extension":"pdf"},"filename":"etna_2002_2003cronologia_eventi_azioni.pdf"}}}],"field_correlazioni":[],"field_normative":[]}}},"pageContext":{"slug":"/volcanic/etna-eruption-2002-2003/","lang":"en","menu":[{"node":{"name":"Press area","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/media-and-communication/press-area/"},"drupal_internal__nid":300000472},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1609}},{"node":{"name":"Administration payments","weight":14,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/administration-payments/"},"drupal_internal__nid":796389},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1576}},{"node":{"name":"Contact Center","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/"},"drupal_internal__nid":300001715},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1602}},{"node":{"name":"Department","weight":135,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1474}},{"node":{"name":"Extraordinary and emergency interventions","weight":15,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1580}},{"node":{"name":"Total amount of debts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/administration-payments/total-amount-debts/"},"drupal_internal__nid":900013313},"parent":[{"name":"Administration payments","drupal_internal__tid":1576}]},"drupal_internal__tid":2379}},{"node":{"name":"Informative on personal data processing","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/informative-personal-data-processing/"},"drupal_internal__nid":300002119},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1606}},{"node":{"name":"Media and Communication","weight":136,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1608}},{"node":{"name":"Minister","weight":134,"relationships":{"field_link_menu":{"fields":{"slug":"/minister/"},"drupal_internal__nid":900006702},"parent":[]},"drupal_internal__tid":2146}},{"node":{"name":"Other contents","weight":16,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/"},"drupal_internal__nid":737805},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1597}},{"node":{"name":"Q&A","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/qa/"},"drupal_internal__nid":900013597},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":2396}},{"node":{"name":"Thematic areas","weight":144,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1617}},{"node":{"name":"Homepage","weight":0,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1470}},{"node":{"name":"404","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1471}},{"node":{"name":"Absence rates","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/absence-rates/"},"drupal_internal__nid":738046},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1525}},{"node":{"name":"Accessibility and catalog of data, metadata and databases","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/accessibility-and-catalog-data-metadata-and-databases/"},"drupal_internal__nid":737775},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1599}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/activities/"},"drupal_internal__nid":300002135},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1846}},{"node":{"name":"Activities and procedures","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/"},"drupal_internal__nid":737256},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1546}},{"node":{"name":"Administrative management provisions","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/"},"drupal_internal__nid":737340},"parent":[{"name":"Provisions","drupal_internal__tid":1552}]},"drupal_internal__tid":1554}},{"node":{"name":"Agreements signed by the administration","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/agreements-signed-administration/"},"drupal_internal__nid":794339},"parent":[{"name":"Administrative management provisions","drupal_internal__tid":1554}]},"drupal_internal__tid":1557}},{"node":{"name":"Ammontare complessivo dei premi","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/ammontare-complessivo-dei-premi/"},"drupal_internal__nid":794015},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1534}},{"node":{"name":"Archive of agreements signed by the administration","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/agreements-signed-administration/archive-agreements-signed-administration/"},"drupal_internal__nid":1047867},"parent":[{"name":"Agreements signed by the administration","drupal_internal__tid":1557}]},"drupal_internal__tid":1558}},{"node":{"name":"Awards data","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/awards-data/"},"drupal_internal__nid":737896},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1535}},{"node":{"name":"Budget and final balance","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/budget-and-final-balance/"},"drupal_internal__nid":737193},"parent":[{"name":"Budgets","drupal_internal__tid":1568}]},"drupal_internal__tid":1570}},{"node":{"name":"Budgets","weight":12,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/"},"drupal_internal__nid":636544},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1568}},{"node":{"name":"Checks","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/checks/"},"drupal_internal__nid":739434},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1587}},{"node":{"name":"CIMA Foundation","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/cima-foundation/"},"drupal_internal__nid":794079},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":1540}},{"node":{"name":"Civic access","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/civic-access/"},"drupal_internal__nid":737795},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1600}},{"node":{"name":"Code of Conduct and Disciplinary Code","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/code-conduct-and-disciplinary-code/"},"drupal_internal__nid":738411},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1507}},{"node":{"name":"Collective negotiation","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/collective-negotiation/"},"drupal_internal__nid":738016},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1528}},{"node":{"name":"Competition announcements","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/competition-announcements/"},"drupal_internal__nid":738532},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1516}},{"node":{"name":"Concession acts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/"},"drupal_internal__nid":737855},"parent":[{"name":"Economic Advantages","drupal_internal__tid":1560}]},"drupal_internal__tid":1562}},{"node":{"name":"Conferral requirements","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/conferral-requirements/"},"drupal_internal__nid":894080},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1490}},{"node":{"name":"Consultants and collaborators of the Department","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/consultants-and-collaborators-department/"},"drupal_internal__nid":742728},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":2349}},{"node":{"name":"Contacts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/contacts/"},"drupal_internal__nid":300002417},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1604}},{"node":{"name":"Contacts - Ukraine Emergency","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/contacts-ukraine-emergency/"},"drupal_internal__nid":900004388},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1985}},{"node":{"name":"Contributions for meteo-hydro events of May 2013","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/"},"drupal_internal__nid":739484},"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1582}},{"node":{"name":"Contributions for meteo-hydro events of October 2018","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-october-2018/"},"drupal_internal__nid":1066704},"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1590}},{"node":{"name":"Controlled bodies","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/"},"drupal_internal__nid":149930},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1537}},{"node":{"name":"Controlled private-law entities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/"},"drupal_internal__nid":149940},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1538}},{"node":{"name":"Controlled public bodies","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-public-bodies/"},"drupal_internal__nid":149880},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1542}},{"node":{"name":"Criteria and modalities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/criteria-and-modalities/"},"drupal_internal__nid":737865},"parent":[{"name":"Economic Advantages","drupal_internal__tid":1560}]},"drupal_internal__tid":1561}},{"node":{"name":"Deputy Head of Department","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/deputy-head-department/"},"drupal_internal__nid":796275},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1477}},{"node":{"name":"Diploma of public merit","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/diploma-public-merit/"},"drupal_internal__nid":894252},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1493}},{"node":{"name":"Donations","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/donations/"},"drupal_internal__nid":900012050},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":2346}},{"node":{"name":"Economic Advantages","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/"},"drupal_internal__nid":153187},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1560}},{"node":{"name":"Emergencies","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Emergenze"}},"drupal_internal__nid":1558},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1621}},{"node":{"name":"Emergencies for environmental, health, technological and fire risk","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-environmental-health-technological-and-fire-risk/"},"drupal_internal__nid":150374},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1592}},{"node":{"name":"Emergencies for meteo-hydro risk","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/"},"drupal_internal__nid":741016},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1581}},{"node":{"name":"Eucentre Foundation","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/eucentre-foundation/"},"drupal_internal__nid":794065},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":1539}},{"node":{"name":"European projects","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/european-projects/"},"drupal_internal__nid":900012016},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1601}},{"node":{"name":"Evaluation board","weight":12,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/evaluation-board/"},"drupal_internal__nid":737996},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1530}},{"node":{"name":"Events","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Eventi"}},"drupal_internal__nid":395},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1628}},{"node":{"name":"Executive terminations","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/executive-terminations/"},"drupal_internal__nid":738096},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1520}},{"node":{"name":"Extraordinary and emergency interventions","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/extraordinary-and-emergency-interventions/"},"drupal_internal__nid":67641},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1498}},{"node":{"name":"FAQ","weight":1,"relationships":{"field_link_menu":null,"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1589}},{"node":{"name":"Forms","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/forms/"},"drupal_internal__nid":300001717},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1607}},{"node":{"name":"General acts","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/"},"drupal_internal__nid":738451},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1502}},{"node":{"name":"General administrative acts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/general-administrative-acts/"},"drupal_internal__nid":738431},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1504}},{"node":{"name":"General dispositions","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1500}},{"node":{"name":"Glossary","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/elenco-glossario--versione-inglese-/"},"drupal_internal__nid":1664},"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1472}},{"node":{"name":"Graphic representation","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/graphic-representation/"},"drupal_internal__nid":740317},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1541}},{"node":{"name":"Head of Department","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/head-department/"},"drupal_internal__nid":796260},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1476}},{"node":{"name":"Holders of executive positions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/holders-executive-positions/"},"drupal_internal__nid":738106},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1518}},{"node":{"name":"Holders of political, administrative, management or government positions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/holders-political-administrative-management-or-government-positions/"},"drupal_internal__nid":738381},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1510}},{"node":{"name":"Holders of top management positions in administration","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/holders-top-management-positions-administration/"},"drupal_internal__nid":793762},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1519}},{"node":{"name":"How the contribution is dispensed","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/how-contribution-dispensed/"},"drupal_internal__nid":739444},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1586}},{"node":{"name":"How to apply","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/how-apply/"},"drupal_internal__nid":739464},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1585}},{"node":{"name":"Information obligations for citizend and firms","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/information-obligations-citizend-and-firms/"},"drupal_internal__nid":738401},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1508}},{"node":{"name":"Insegna","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/insegna/"},"drupal_internal__nid":894264},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1494}},{"node":{"name":"Insurance claims and other contributions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/insurance-claims-and-other-contributions/"},"drupal_internal__nid":739454},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1583}},{"node":{"name":"Integrated Plan of Activities and Organisation (PIAO) 2023-2025","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/integrated-plan-activities-and-organisation-piao-2023-2025/"},"drupal_internal__nid":900009362},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":2186}},{"node":{"name":"Integrative negotiation","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/integrative-negotiation/"},"drupal_internal__nid":738006},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1529}},{"node":{"name":"International Relations","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Relazioni internazionali"}},"drupal_internal__nid":1550},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1622}},{"node":{"name":"International states of emergency","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/international-states-emergency/"},"drupal_internal__nid":740536},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1593}},{"node":{"name":"Latest news","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Press area","drupal_internal__tid":1609}]},"drupal_internal__tid":1610}},{"node":{"name":"Legal Measure","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/legal-measure/"},"drupal_internal__nid":4581},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1550}},{"node":{"name":"List and register of beneficiaries","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/list-and-register-beneficiaries/"},"drupal_internal__nid":894294},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1496}},{"node":{"name":"Maps","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Mappe"}},"drupal_internal__nid":1556},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1627}},{"node":{"name":"Media Kit","weight":1,"relationships":{"field_link_menu":null,"parent":[{"name":"Press area","drupal_internal__tid":1609}]},"drupal_internal__tid":1611}},{"node":{"name":"Meritorious Award","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/"},"drupal_internal__nid":300001699},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1489}},{"node":{"name":"Mobility procedures","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/mobility-procedures/"},"drupal_internal__nid":738026},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1527}},{"node":{"name":"Monitoraggio tempi procedimentali","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/monitoraggio-tempi-procedimentali/"},"drupal_internal__nid":737236},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1548}},{"node":{"name":"Mortgage payments","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/mortgage-payments/"},"drupal_internal__nid":153207},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1563}},{"node":{"name":"National Recovery and Resilience Plan objectives","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Attuazione Misure PNRR"}},"drupal_internal__nid":900004848},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":2016}},{"node":{"name":"National Service","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Servizio Nazionale"}},"drupal_internal__nid":1516},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1619}},{"node":{"name":"Office for the Coordination of Legal, Legislative and Litigation Activities","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-coordination-legal-legislative-and-litigation-activities/"},"drupal_internal__nid":796188},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1931}},{"node":{"name":"Office I - Voluntary work and resources of the National Service","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-i-voluntary-work-and-resources-national-service/"},"drupal_internal__nid":300002401},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1479}},{"node":{"name":"Office II - Technical and scientific activities for risk forecasting and prevention","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-ii-technical-and-scientific-activities-risk-forecasting-and-prevention/"},"drupal_internal__nid":795130},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1480}},{"node":{"name":"Office III - Planning and emergency infrastructure interventions","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-iii-planning-and-emergency-infrastructure-interventions/"},"drupal_internal__nid":795657},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1481}},{"node":{"name":"Office IV - Activities for overcoming the emergency","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-iv-activities-overcoming-emergency/"},"drupal_internal__nid":795798},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1482}},{"node":{"name":"Office V - Human and instrumental resources and general operating services","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-v-human-and-instrumental-resources-and-general-operating-services/"},"drupal_internal__nid":795844},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1483}},{"node":{"name":"Office VI - Administration and budget","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-vi-administration-and-budget/"},"drupal_internal__nid":100837793},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1484}},{"node":{"name":"Offices outline","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/offices-outline/"},"drupal_internal__nid":738361},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1513}},{"node":{"name":"Operational Director","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/operational-director/"},"drupal_internal__nid":796349},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1478}},{"node":{"name":"Organization","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/"},"drupal_internal__nid":742829},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1509}},{"node":{"name":"Organizational positions","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/organizational-positions/"},"drupal_internal__nid":738076},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1522}},{"node":{"name":"Organizational wellbeing","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/organizational-wellbeing/"},"drupal_internal__nid":737886},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1536}},{"node":{"name":"Payments data","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/administration-payments/payments-data/"},"drupal_internal__nid":737310},"parent":[{"name":"Administration payments","drupal_internal__tid":1576}]},"drupal_internal__tid":1577}},{"node":{"name":"Performance","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/"},"drupal_internal__nid":150250},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1531}},{"node":{"name":"Performance measuring and evaluating systems","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/performance-measuring-and-evaluating-systems/"},"drupal_internal__nid":737926},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1532}},{"node":{"name":"Performance plan and report","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/performance-plan-and-report/"},"drupal_internal__nid":737916},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1533}},{"node":{"name":"Permanent commission","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/permanent-commission/"},"drupal_internal__nid":894175},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1492}},{"node":{"name":"Personnel","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/"},"drupal_internal__nid":152494},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1517}},{"node":{"name":"Personnel assigned to offices and services of the Department","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/personnel-assigned-offices-and-services-department/"},"drupal_internal__nid":742010},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1511}},{"node":{"name":"Photo and video","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/photo-and-video-/"},"drupal_internal__nid":4585},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1615}},{"node":{"name":"Plan of indicators and expected budget results","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/plan-indicators-and-expected-budget-results/"},"drupal_internal__nid":737182},"parent":[{"name":"Budgets","drupal_internal__tid":1568}]},"drupal_internal__tid":1569}},{"node":{"name":"Political bodies provisions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/political-bodies-provisions/"},"drupal_internal__nid":737350},"parent":[{"name":"Provisions","drupal_internal__tid":1552}]},"drupal_internal__tid":1553}},{"node":{"name":"Premises","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/premises/"},"drupal_internal__nid":300001709},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1487}},{"node":{"name":"Prevention of corruption","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/prevention-corruption/"},"drupal_internal__nid":737785},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1598}},{"node":{"name":"Procedure for the conferral","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/procedure-conferral/"},"drupal_internal__nid":894164},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1491}},{"node":{"name":"Procedures data","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/procedures-data/"},"drupal_internal__nid":737330},"parent":[{"name":"Administrative management provisions","drupal_internal__tid":1554}]},"drupal_internal__tid":1555}},{"node":{"name":"Provisions","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/"},"drupal_internal__nid":153362},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1552}},{"node":{"name":"Publications","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/publications/"},"drupal_internal__nid":1668},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1613}},{"node":{"name":"Q&A","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Domande e risposte"}},"drupal_internal__nid":300000828},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1623}},{"node":{"name":"Register of companies and procedures for accreditation","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/register-companies-and-procedures-accreditation/"},"drupal_internal__nid":894274},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1495}},{"node":{"name":"Regulations","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/regulations/"},"drupal_internal__nid":894342},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1497}},{"node":{"name":"Regulatory references on organizations and activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/regulatory-references-organizations-and-activities/"},"drupal_internal__nid":738441},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1503}},{"node":{"name":"ReLuis Consortium","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-public-bodies/reluis-consortium/"},"drupal_internal__nid":794128},"parent":[{"name":"Controlled public bodies","drupal_internal__tid":1542}]},"drupal_internal__tid":1543}},{"node":{"name":"Rental and lease","weight":13,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/rental-and-lease/"},"drupal_internal__nid":150260},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1571}},{"node":{"name":"Replacement declarations and ex officio acquisition of data","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/replacement-declarations-and-ex-officio-acquisition-data/"},"drupal_internal__nid":737225},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1549}},{"node":{"name":"Request of patronage","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/request-patronage/"},"drupal_internal__nid":300001719},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1488}},{"node":{"name":"RETURN Foundation (Multi- Risk sciEnce for resilienT commUnities undeR a changiNg climate)","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/return-foundation-multi-risk-science-resilient-communities-under-changing-climate/"},"drupal_internal__nid":900010280},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":2213}},{"node":{"name":"Risks","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Rischi"}},"drupal_internal__nid":440},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1620}},{"node":{"name":"Sanctions for failed data communication","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/sanctions-failed-data-communication/"},"drupal_internal__nid":900000844},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1512}},{"node":{"name":"Sanctions for failed data communication","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/sanctions-failed-data-communication/"},"drupal_internal__nid":793791},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1521}},{"node":{"name":"Service Features","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/service-features/"},"drupal_internal__nid":100838033},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1603}},{"node":{"name":"Sitemap","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/homepage/sitemap/"},"drupal_internal__nid":422},"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1473}},{"node":{"name":"Social","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/media-and-communication/social/"},"drupal_internal__nid":300001731},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1614}},{"node":{"name":"Special cases","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/special-cases/"},"drupal_internal__nid":739424},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1588}},{"node":{"name":"States of emergency for seismic risk","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/states-emergency-seismic-risk/"},"drupal_internal__nid":740582},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1591}},{"node":{"name":"States of emergency not managed by the Department","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/states-emergency-not-managed-department/"},"drupal_internal__nid":740513},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1594}},{"node":{"name":"Strategic and management planning documents","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/strategic-and-management-planning-documents/"},"drupal_internal__nid":738421},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1505}},{"node":{"name":"Structure","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/"},"drupal_internal__nid":300001707},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1475}},{"node":{"name":"Subsidiary companies","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/subsidiary-companies/"},"drupal_internal__nid":740276},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1544}},{"node":{"name":"Supervised public bodies","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/supervised-public-bodies/"},"drupal_internal__nid":740266},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1545}},{"node":{"name":"Supplementary worksheet","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/-supplementary-worksheet/"},"drupal_internal__nid":1374051},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1612}},{"node":{"name":"Systematic equipment","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/systematic-equipment/"},"drupal_internal__nid":738066},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1523}},{"node":{"name":"Tasks assigned and authorized to public servants","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/tasks-assigned-and-authorized-public-servants/"},"drupal_internal__nid":738036},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1526}},{"node":{"name":"Technical attachments to the ordinances for recognition of the requirements","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/legal-measure/technical-attachments-ordinances-recognition-requirements/"},"drupal_internal__nid":741657},"parent":[{"name":"Legal Measure","drupal_internal__tid":1550}]},"drupal_internal__tid":1551}},{"node":{"name":"Telephone and email","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/telephone-and-email/"},"drupal_internal__nid":793720},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1514}},{"node":{"name":"Temporary personnel","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/temporary-personnel/"},"drupal_internal__nid":738056},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1524}},{"node":{"name":"Tender and contract list","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Tenders and contracts","drupal_internal__tid":1559}]},"drupal_internal__tid":1878}},{"node":{"name":"Tenders and contracts","weight":10,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1559}},{"node":{"name":"Three-year plan for the prevention of corruption and transparency","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/three-year-plan-prevention-corruption-and-transparency/"},"drupal_internal__nid":738461},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1501}},{"node":{"name":"Training","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Formazione"}},"drupal_internal__nid":1566},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1624}},{"node":{"name":"Transfers for civil protecion emergencies","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-civil-protecion-emergencies/"},"drupal_internal__nid":990363},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1564}},{"node":{"name":"Transfers for national and international civil protection exercises","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-national-and-international-civil-protection-exercises/"},"drupal_internal__nid":152541},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1565}},{"node":{"name":"Transfers ruled by art.11","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-ruled-art11/"},"drupal_internal__nid":795880},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1566}},{"node":{"name":"Transfers to the Regions for the management of hydro-meteo-pluviometric networks","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-regions-management-hydro-meteo-pluviometric-networks/"},"drupal_internal__nid":149758},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1567}},{"node":{"name":"Transparent administration","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/transparent-administration/"},"drupal_internal__nid":399},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1499}},{"node":{"name":"Type of damage and goods elegible for contribution","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/type-damage-and-goods-elegible-contribution/"},"drupal_internal__nid":739474},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1584}},{"node":{"name":"Types of procedure","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/types-procedure/"},"drupal_internal__nid":737246},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1547}},{"node":{"name":"Volunteering","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Volontariato"}},"drupal_internal__nid":1568},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1618}},{"node":{"name":"Write to Contact Center","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/write-contact-center/"},"drupal_internal__nid":300001729},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1605}},{"node":{"name":"Young people","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Giovani"}},"drupal_internal__nid":1546},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1625}}],"menuMinisito":[{"node":{"name":"Health","weight":90,"relationships":{"field_link_menu":{"fields":{"slug":"/health/"},"drupal_internal__nid":68002},"parent":[]},"drupal_internal__tid":1399}},{"node":{"name":"Earthquake in Turkey and Syria 2023","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/earthquake-turkey-and-syria-2023/"},"drupal_internal__nid":900007602},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":2153}},{"node":{"name":"Abruzzo 2009 Earthquake","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/"},"drupal_internal__nid":1049993},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":1320}},{"node":{"name":"Central Italy Earthquake 2016","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/"},"drupal_internal__nid":479111},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":1294}},{"node":{"name":"Chile 2010 Earthquake","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/chile-2010-earthquake/"},"drupal_internal__nid":56974},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":1359}},{"node":{"name":"Emilia Romagna and Lombardy Earthquake 2012","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/"},"drupal_internal__nid":50839},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":1309}},{"node":{"name":"Environmental","weight":91,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/"},"drupal_internal__nid":900003428},"parent":[]},"drupal_internal__tid":1408}},{"node":{"name":"Etna eruption 2002-2003","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/etna-eruption-2002-2003/"},"drupal_internal__nid":900013459},"parent":[{"name":"Volcanic","drupal_internal__tid":1372}]},"drupal_internal__tid":1378}},{"node":{"name":"Etna eruption 2008-2009","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/etna-eruption-2008-2009/"},"drupal_internal__nid":900013451},"parent":[{"name":"Volcanic","drupal_internal__tid":1372}]},"drupal_internal__tid":1376}},{"node":{"name":"Fire","weight":89,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/"},"drupal_internal__nid":155170},"parent":[]},"drupal_internal__tid":1396}},{"node":{"name":"Etna eruption 2006-2007","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/etna-eruption-2006-2007/"},"drupal_internal__nid":900013457},"parent":[{"name":"Volcanic","drupal_internal__tid":1372}]},"drupal_internal__tid":1377}},{"node":{"name":"Haiti 2010 Earthquake","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/haiti-2010-earthquake/"},"drupal_internal__nid":51084},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":1358}},{"node":{"name":"Humanitarian","weight":93,"relationships":{"field_link_menu":{"fields":{"slug":"/humanitarian/"},"drupal_internal__nid":900003932},"parent":[]},"drupal_internal__tid":1980}},{"node":{"name":"Ischia earthquake 2017","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/ischia-earthquake-2017/"},"drupal_internal__nid":669683},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":1292}},{"node":{"name":"Meteo-Hydro","weight":87,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/"},"drupal_internal__nid":155160},"parent":[]},"drupal_internal__tid":1382}},{"node":{"name":"Nepal 2015 Earthquake","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/nepal-2015-earthquake/"},"drupal_internal__nid":173372},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":1353}},{"node":{"name":"Return to Earth of satellites","weight":92,"relationships":{"field_link_menu":{"fields":{"slug":"/return-earth-satellites/"},"drupal_internal__nid":1006382},"parent":[]},"drupal_internal__tid":1418}},{"node":{"name":"Eyjafjöll eruption Iceland 2010","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/eyjafjoll-eruption-iceland-2010/"},"drupal_internal__nid":900013453},"parent":[{"name":"Volcanic","drupal_internal__tid":1372}]},"drupal_internal__tid":1381}},{"node":{"name":"Stromboli eruption 2007","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/stromboli-eruption-2007/"},"drupal_internal__nid":900013455},"parent":[{"name":"Volcanic","drupal_internal__tid":1372}]},"drupal_internal__tid":1374}},{"node":{"name":"Tsunami","weight":88,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/"},"drupal_internal__nid":173616},"parent":[]},"drupal_internal__tid":1393}},{"node":{"name":"Stromboli eruption 2024","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/stromboli-eruption-2024/"},"drupal_internal__nid":900013449},"parent":[{"name":"Volcanic","drupal_internal__tid":1372}]},"drupal_internal__tid":2390}},{"node":{"name":"Bad weather October-November 2018","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/bad-weather-october-november-2018/"},"drupal_internal__nid":900010882},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":2283}},{"node":{"name":"Volcanic","weight":86,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/"},"drupal_internal__nid":900013469},"parent":[]},"drupal_internal__tid":1372}},{"node":{"name":"Seismic","weight":85,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/"},"drupal_internal__nid":155140},"parent":[]},"drupal_internal__tid":1290}},{"node":{"name":"2005 Cerzeto Landslide","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/2005-cerzeto-landslide/"},"drupal_internal__nid":75950},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":1390}},{"node":{"name":"2008 Tevere Flooding","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/2008-tevere-flooding/"},"drupal_internal__nid":177109},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":1389}},{"node":{"name":"2009 Messina Flooding","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/2009-messina-flooding/"},"drupal_internal__nid":174795},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":1388}},{"node":{"name":"2010 Montaguto Landslide","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/2010-montaguto-landslide/"},"drupal_internal__nid":52179},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":1387}},{"node":{"name":"2012 Snow in the Centre- South","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/2012-snow-centre-south/"},"drupal_internal__nid":81459},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":1384}},{"node":{"name":"Accessibility checks","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/accessibility-checks/"},"drupal_internal__nid":1050303},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1321}},{"node":{"name":"Activation of the National Service of Civil Protection","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/activation-national-service-civil-protection/"},"drupal_internal__nid":174387},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1311}},{"node":{"name":"Albania 2019 Earthquake","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/albania-2019-earthquake/"},"drupal_internal__nid":1180492},"parent":[{"name":"Seismic","drupal_internal__tid":1290}]},"drupal_internal__tid":1348}},{"node":{"name":"Alluvione Mozambico 2019","weight":3,"relationships":{"field_link_menu":null,"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":1392}},{"node":{"name":"Assistance to the population","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/assistance-population/"},"drupal_internal__nid":669947},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1297}},{"node":{"name":"Assistance to the population","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/assistance-population/"},"drupal_internal__nid":78509},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1313}},{"node":{"name":"Assistance to the population","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/assistance-population/"},"drupal_internal__nid":1049317},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1332}},{"node":{"name":"Assistance to the population","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/albania-2019-earthquake/assistance-population/"},"drupal_internal__nid":1190103},"parent":[{"name":"Albania 2019 Earthquake","drupal_internal__tid":1348}]},"drupal_internal__tid":1350}},{"node":{"name":"Assistance to the population","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/libya-flooding-2023/assistance-population/"},"drupal_internal__nid":900010222},"parent":[{"name":"Libya Flooding 2023","drupal_internal__tid":2204}]},"drupal_internal__tid":2206}},{"node":{"name":"Bad weather October-November 2011","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/bad-weather-october-november-2011/"},"drupal_internal__nid":787025},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":1385}},{"node":{"name":"Communication activities","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/communication-activities/"},"drupal_internal__nid":1049950},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1333}},{"node":{"name":"Coronavirus","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/health/coronavirus/"},"drupal_internal__nid":300000550},"parent":[{"name":"Health","drupal_internal__tid":1399}]},"drupal_internal__tid":1401}},{"node":{"name":"Criticality verifications","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/criticality-verifications/"},"drupal_internal__nid":670038},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1305}},{"node":{"name":"Cultural heritage","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/cultural-heritage/"},"drupal_internal__nid":670004},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1301}},{"node":{"name":"Cultural heritage","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/cultural-heritage/"},"drupal_internal__nid":1050271},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1324}},{"node":{"name":"Damage assessment","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/albania-2019-earthquake/damage-assessment/"},"drupal_internal__nid":1190123},"parent":[{"name":"Albania 2019 Earthquake","drupal_internal__tid":1348}]},"drupal_internal__tid":1351}},{"node":{"name":"Deployed Forces","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/deployed-forces/"},"drupal_internal__nid":670103},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1296}},{"node":{"name":"Deployed Forces","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/deployed-forces/"},"drupal_internal__nid":174459},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1314}},{"node":{"name":"Deployed Forces","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/deployed-forces/"},"drupal_internal__nid":1048720},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1326}},{"node":{"name":"Donations","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/donations/"},"drupal_internal__nid":669651},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1295}},{"node":{"name":"Donations","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/donations/"},"drupal_internal__nid":71305},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1318}},{"node":{"name":"Donations","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/donations/"},"drupal_internal__nid":1050093},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1327}},{"node":{"name":"Donations","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/albania-2019-earthquake/donations/"},"drupal_internal__nid":1190162},"parent":[{"name":"Albania 2019 Earthquake","drupal_internal__tid":1348}]},"drupal_internal__tid":1352}},{"node":{"name":"Effects of the earthquake","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/effects-earthquake/"},"drupal_internal__nid":174323},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1317}},{"node":{"name":"Emergency management operation facilities","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/costa-concordia-shipwreck-2012-2014/emergency-management-operation-facilities/"},"drupal_internal__nid":900003290},"parent":[{"name":"The Costa Concordia Shipwreck 2012-2014","drupal_internal__tid":1970}]},"drupal_internal__tid":1976}},{"node":{"name":"Emilia 2012","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/emilia-2012/"},"drupal_internal__nid":174425},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1310}},{"node":{"name":"Emilia Romagna bad weather 2023","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/emilia-romagna-bad-weather-2023/"},"drupal_internal__nid":900008826},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":2175}},{"node":{"name":"Environmental monitoring","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/costa-concordia-shipwreck-2012-2014/environmental-monitoring/"},"drupal_internal__nid":900003382},"parent":[{"name":"The Costa Concordia Shipwreck 2012-2014","drupal_internal__tid":1970}]},"drupal_internal__tid":1974}},{"node":{"name":"Eruption and tsunami Stromboli 2002","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/eruption-and-tsunami-stromboli-2002/"},"drupal_internal__nid":900001302},"parent":[{"name":"Tsunami","drupal_internal__tid":1393}]},"drupal_internal__tid":1924}},{"node":{"name":"European funds","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/health/coronavirus/european-funds/"},"drupal_internal__nid":900002874},"parent":[{"name":"Coronavirus","drupal_internal__tid":1401}]},"drupal_internal__tid":1949}},{"node":{"name":"Expression of interest for contact tracing activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/health/coronavirus/expression-interest-contact-tracing-activities/"},"drupal_internal__nid":300000616},"parent":[{"name":"Coronavirus","drupal_internal__tid":1401}]},"drupal_internal__tid":1403}},{"node":{"name":"First hours of the emergency","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/first-hours-emergency/"},"drupal_internal__nid":1050111},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1328}},{"node":{"name":"First interventions","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/first-interventions/"},"drupal_internal__nid":174415},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1312}},{"node":{"name":"First interventions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/libya-flooding-2023/first-interventions/"},"drupal_internal__nid":900010220},"parent":[{"name":"Libya Flooding 2023","drupal_internal__tid":2204}]},"drupal_internal__tid":2205}},{"node":{"name":"Healthcare activities","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/healthcare-activities/"},"drupal_internal__nid":783927},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1306}},{"node":{"name":"Healthcare activities","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/healthcare-activities/"},"drupal_internal__nid":1049869},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1323}},{"node":{"name":"Housing solutions","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/housing-solutions/"},"drupal_internal__nid":670014},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1300}},{"node":{"name":"Housing solutions","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/housing-solutions/"},"drupal_internal__nid":1050195},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1330}},{"node":{"name":"How to donate","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/health/coronavirus/how-donate/"},"drupal_internal__nid":1252969},"parent":[{"name":"Coronavirus","drupal_internal__tid":1401}]},"drupal_internal__tid":1380}},{"node":{"name":"Information to the population","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/information-population/"},"drupal_internal__nid":78763},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1319}},{"node":{"name":"Intervention plans","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/costa-concordia-shipwreck-2012-2014/intervention-plans/"},"drupal_internal__nid":900003386},"parent":[{"name":"The Costa Concordia Shipwreck 2012-2014","drupal_internal__tid":1970}]},"drupal_internal__tid":1972}},{"node":{"name":"Italian intervention","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/albania-2019-earthquake/italian-intervention/"},"drupal_internal__nid":1188537},"parent":[{"name":"Albania 2019 Earthquake","drupal_internal__tid":1348}]},"drupal_internal__tid":1349}},{"node":{"name":"Japan earthquake and tsunami","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/japan-earthquake-and-tsunami/"},"drupal_internal__nid":173581},"parent":[{"name":"Tsunami","drupal_internal__tid":1393}]},"drupal_internal__tid":1395}},{"node":{"name":"Libya Flooding 2023","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/libya-flooding-2023/"},"drupal_internal__nid":900010210},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":2204}},{"node":{"name":"Macroseismic survey","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/ischia-earthquake-2017/macroseismic-survey/"},"drupal_internal__nid":669673},"parent":[{"name":"Ischia earthquake 2017","drupal_internal__tid":1292}]},"drupal_internal__tid":1293}},{"node":{"name":"Monitoring activities","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/monitoring-activities/"},"drupal_internal__nid":174446},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1316}},{"node":{"name":"Productive management","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/productive-management/"},"drupal_internal__nid":669884},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1304}},{"node":{"name":"Psychosocial activities","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/psychosocial-activities/"},"drupal_internal__nid":1049376},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1322}},{"node":{"name":"Rimozione ecoballe Golfo Follonica 2020","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/rimozione-ecoballe-golfo-follonica-2020/"},"drupal_internal__nid":900003470},"parent":[{"name":"Environmental","drupal_internal__tid":1408}]},"drupal_internal__tid":1983}},{"node":{"name":"Road access","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/road-access/"},"drupal_internal__nid":669905},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1302}},{"node":{"name":"Rubble management","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/rubble-management/"},"drupal_internal__nid":669894},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1303}},{"node":{"name":"Safety","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/safety/"},"drupal_internal__nid":669937},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1298}},{"node":{"name":"Safety checks","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/emilia-romagna-and-lombardy-earthquake-2012/safety-checks/"},"drupal_internal__nid":78529},"parent":[{"name":"Emilia Romagna and Lombardy Earthquake 2012","drupal_internal__tid":1309}]},"drupal_internal__tid":1315}},{"node":{"name":"Schools","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/central-italy-earthquake-2016/schools/"},"drupal_internal__nid":670082},"parent":[{"name":"Central Italy Earthquake 2016","drupal_internal__tid":1294}]},"drupal_internal__tid":1299}},{"node":{"name":"Schools","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/schools/"},"drupal_internal__nid":1050241},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1329}},{"node":{"name":"Sempre con Voi Fund","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/health/coronavirus/sempre-con-voi-fund/"},"drupal_internal__nid":300000556},"parent":[{"name":"Coronavirus","drupal_internal__tid":1401}]},"drupal_internal__tid":1402}},{"node":{"name":"Ship monitoring","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/costa-concordia-shipwreck-2012-2014/ship-monitoring/"},"drupal_internal__nid":900003286},"parent":[{"name":"The Costa Concordia Shipwreck 2012-2014","drupal_internal__tid":1970}]},"drupal_internal__tid":1973}},{"node":{"name":"Technical Scientific Committee Covid-19 official reports","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/health/coronavirus/technical-scientific-committee-covid-19-official-reports/"},"drupal_internal__nid":300000554},"parent":[{"name":"Coronavirus","drupal_internal__tid":1401}]},"drupal_internal__tid":1404}},{"node":{"name":"Territorial monitoring","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/abruzzo-2009-earthquake/territorial-monitoring/"},"drupal_internal__nid":1050299},"parent":[{"name":"Abruzzo 2009 Earthquake","drupal_internal__tid":1320}]},"drupal_internal__tid":1334}},{"node":{"name":"The activities of the Deputy Commissioner","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/costa-concordia-shipwreck-2012-2014/activities-deputy-commissioner/"},"drupal_internal__nid":900003288},"parent":[{"name":"The Costa Concordia Shipwreck 2012-2014","drupal_internal__tid":1970}]},"drupal_internal__tid":1975}},{"node":{"name":"The aid","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/earthquake-turkey-and-syria/aid/"},"drupal_internal__nid":900007598},"parent":[{"name":"Earthquake in Turkey and Syria 2023","drupal_internal__tid":2153}]},"drupal_internal__tid":2155}},{"node":{"name":"The Costa Concordia Shipwreck 2012-2014","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/costa-concordia-shipwreck-2012-2014/"},"drupal_internal__nid":900003282},"parent":[{"name":"Environmental","drupal_internal__tid":1408}]},"drupal_internal__tid":1970}},{"node":{"name":"The Italian intervention","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/earthquake-turkey-and-syria/italian-intervention/"},"drupal_internal__nid":900007600},"parent":[{"name":"Earthquake in Turkey and Syria 2023","drupal_internal__tid":2153}]},"drupal_internal__tid":2154}},{"node":{"name":"The stages of the emergency","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"The Costa Concordia Shipwreck 2012-2014","drupal_internal__tid":1970}]},"drupal_internal__tid":1971}},{"node":{"name":"Veneto Flooding","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/veneto-flooding/"},"drupal_internal__nid":84803},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":1386}},{"node":{"name":"Water crisis 2022","weight":2,"relationships":{"field_link_menu":null,"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1382}]},"drupal_internal__tid":2018}}],"menuFooter":[{"node":{"name":"Privacy","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/privacy-0/"},"drupal_internal__nid":300001705}},"drupal_internal__tid":1891}},{"node":{"name":"Certified mail PEC","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/certified-e-mail-pec/"},"drupal_internal__nid":300000300}},"drupal_internal__tid":1890}},{"node":{"name":"Contacts","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/contacts/"},"drupal_internal__nid":300001713}},"drupal_internal__tid":1893}},{"node":{"name":"Glossary","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/elenco-glossario--versione-inglese-/"},"drupal_internal__nid":1664}},"drupal_internal__tid":1887}},{"node":{"name":"Legal notes","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/note-legali/"},"drupal_internal__nid":300001711}},"drupal_internal__tid":1892}},{"node":{"name":"Modules","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/forms/"},"drupal_internal__nid":300001717}},"drupal_internal__tid":1889}},{"node":{"name":"Online services","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/online-services/"},"drupal_internal__nid":300001701}},"drupal_internal__tid":1888}}],"socialImg":null}},"staticQueryHashes":[]}